Bridge Building

Group describes the desired future that a group is working toward
(if larger than 12 break out and report back)
Post desired future on R-hand of wall

Current reality – now have groups record existing state of the group
Post on L-hand of wall

Then have group list what activities are needed to bridge those two realities
post and write up this sheet between the other two sheets.

This process helps the group visualize and clarify the actions needed to get a to a particular goal.

Advertisements
This entry was posted in goal-setting, Info-gathering, Toolbox. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s